Real estate development
 Demolition
 Engineering
 Production
 Infrastructures

     
 History
 Mission
 Responsibility
 Certifications  
 Contacts  
 Calolziocorte  

The works involved the urban requalification of Filanda Mangili.

The demolition operation was part of the urban requalification of the Filanda Mangili area in the municipality of Calolziocorte (LC).
The building was constructed in stone reinforced with r.c. columns and horizontal elements in a mixture of brick and cement. The demolition was carried out using excavators equipped with hydraulic crushers and 3 metre boom extensions.

Calolziocorte 
WORKS DURATION 1 month
PLANT

17.5 ton excavators equipped with hydraulic crusher, grabber 3 metre boom extension

10 ton excavators equipped with sorting grabber and bucket

Volume approximately 10,000 cubic metres

 

 Industrial construction

Italcementi

D&G

MOI

Semeraro - Stezzano

 Building infrastructure

Ecosystem - Water Tank

Mestre

Mariano C.se - Water Tower

 Public construction

Caluso

Agenzia Torino 2006

Lecco Hospital

Brescia Primary School

 Residential construction

Bézier

Venezia

Demolition Bertelli e Guerini

Calolziocorte


Trezzo - Cornelli

 
Site Map     |     Real estate development     |     Demolition     |     Engineering     |     Production      |    Video      |    Contacts

© Vitali SpA - via Alberto da Giussano, 15 - 20145 Milano - P.IVA 01948410160 - Registro delle Imprese CCIAA di Milano n° 01948410160 – REA n° 1756450