| The works involved the urban
requalification of Filanda Mangili.
The demolition operation was part of the urban requalification
of the Filanda Mangili area in the municipality of Calolziocorte
(LC).
The building was constructed in stone reinforced
with r.c. columns and horizontal elements in a mixture of
brick and cement. The demolition was carried out using excavators
equipped with hydraulic crushers and 3 metre boom
extensions.
| Calolziocorte |
| WORKS
DURATION |
1 month |
| PLANT |
17.5 ton excavators
equipped with hydraulic crusher, grabber 3 metre boom
extension
10 ton excavators equipped
with sorting grabber and bucket
|
| Volume |
approximately
10,000 cubic metres |
|