| The building to e demolished
was the property of Semeraro and was located in the municipality
of Stezzano. The works involved a total volume of over 50,000
cubic metres and was completed in a very short time.
The structures consisted of prefabricated industrial
buildings erected on site, the load-bearing elements
of which (beams, columns and slabs) were in reinforced
concrete, while the infill and partition walls consisted
of concrete blocks and wooden panels.
| Semeraro |
| WORKS
DURATION |
2 months |
| PLANT |
21 ton excavators
equipped with hydraulic crusher
17.5 ton excavators equipped with hydraulic crusher, grabber
and breaker hammer
10 ton excavators equipped with sorting grabber and bucket
|
| VOLUME |
Approximately 50,000
cubic metres |
|