The new logistics park is located
on the A4 Milan – Venice motorway, European corridor
5. Located at a strategic point on the national and international
road traffic system, the park can be reached from the Cavenago–Cambiago
and Trezzo sull’Adda motorway exits.
The area in question is inside a recently expanded industrial
complex housing a number of important factories and logistic
centres.
The building, which has a floor area of approximately 50,000
square metres, is divided into compartmented warehouses, offices
and services.
The project also includes the construction of warehouses with
loading bays on two sides with a clear height of 10.50 metres.
A total of 70 loading bays will be provided.
On the East face of the first warehouse, a raised two-storey
structure will be provided to house administrational offices
and services and will be reachable by a stairway and lifts.
The warehouses themselves will have raised structures housing
the departmental offices and relative services, complete with
changing rooms.
The buildings will be provided with an American N.F.P.A sprinkler
system, while the compartmentation will be effected by means
of REI120 partitions.
Download brochure.
| TECHNICAL
SPECIFICATIONS |
| SITE AREA |
120.000 square metres |
| BUILDING HEIGHT |
10.50 metres |
| GROSS FLOOR AREA |
51.000 square metres |
| PLANTS AND SYSTEMS |
SPRINKLER SYSTEM in accordance
with NFPA standards
Robotised systems for the physical handling of goods |
| PARKING |
individual parking spaces for
cars and truck |
| OFFICES |
Supplied on a turnkey basis according
to requirements |
|